Villa Demolition in Mussafah, Abu Dhabi

Villa DemolitionMussafah, Abu Dhabi6 Days DurationJanuary 2024

Project Overview

This project involved the complete demolition of a 40-year-old villa in Mussafah, Abu Dhabi. The property owner required a full demolition service including permit handling, controlled demolition, scrap recovery, and site clearance. The villa was a traditional two-story structure with concrete foundations and mixed construction materials including concrete blocks, steel reinforcement, and traditional timber elements.

Challenge

The main challenges for this project included:

  • Age of the structure (40+ years) requiring careful assessment of structural integrity
  • Mixed construction materials requiring specialized demolition techniques
  • Proximity to neighboring properties requiring dust and noise control measures
  • Strict Abu Dhabi municipality regulations for demolition permits and environmental compliance
  • Valuable scrap materials that needed to be recovered and sold

Our Approach

We began with a comprehensive site assessment and structural survey to understand the building's condition and identify any hazardous materials. Following this, we handled all permit applications with the Abu Dhabi municipality, ensuring full compliance with local regulations.

Execution

The demolition was completed in six working days using our specialized equipment and experienced team. We employed controlled demolition techniques to minimize dust and vibration, protecting neighboring properties. All construction waste was sorted on-site for recycling, with valuable materials like steel reinforcement and copper wiring recovered for resale.

Results

The project was completed on time and within budget. The site was left clean and ready for redevelopment, with all demolition waste properly disposed of through licensed facilities. The client received AED 15,000 in scrap value from recovered materials, offsetting part of the demolition costs.

Client Feedback

"Raseen handled our villa demolition professionally from start to finish. They managed all the paperwork with the municipality, completed the work quickly, and even made money from the scrap. Highly recommended for anyone needing demolition services in Abu Dhabi."
- Ahmed Al Mansoori, Property Owner

Project Details

Location:
Mussafah, Abu Dhabi
Duration:
6 working days
Service:
Complete villa demolition
Permit Handling:
Full municipality compliance
Scrap Recovery:
AED 15,000 value recovered

Materials Recovered

  • Steel reinforcement:2.5 tons
  • Copper wiring:150 kg
  • Concrete rubble:45 cubic meters
  • Mixed debris:12 cubic meters
Chat on WhatsApp